17/02/2007 - Speed Robot redesign work. Some photos avaiable here.




19/01/2007 - Robótica 2007 Website avaiable in draft version.

03/01/2007 - Real test with the new inercial system using the CRS-03 from Silicon Sensing Systems.





24/11/2006 - First general assembly of the "Sociedade Portuguesa de Robótica" in Coimbra. The next general assembly will take place in 23-02-2007 in Aveiro.
The "Sociedade Portuguesa de Robótica" was created by public scripture on the 28th of April of 2006 like an association without profitable ends which principal objective is it of promoting and stimulating the teaching, the scientific investigation, the technological development and the applications (industry and services) in the area of the robótica. These objectives will be got through several actions, which include, between others: The National Festival of Robótica, regular publications, seminars and meetings.
At present, the Society is under the co-ordination of a commission instaladora with a president and 10 secretaries even to the realization of the first annual general meeting. The electoral calendar is in preparation and it will be presented shortly.

24/11/2006 - New inercial system implemented.


23/11/2006 - Runner project participated in the "Semana da Ciência e Tecnologia" exhibition that toke place in ISEP in 23 and 24 of November 2006.




28/09/2006 - New wheel install in the SpeedRunner vehicle.


27/09/2006 - Mission manager presentation.


29/08/2006 - Runner project makes the cameras calibration for the development of the new stereo vision system.



19/08/2006 - Joystick interface in Linux, from the PASOS project, tested on Runner vehicles.

09/08/2006 - Runner project made the integration and tested the new mission control system.
05/08/2006 - Pitman motor defect identified in the SpeedRunner robot.

10/07/2006 - Runner project tested the new control system.

08/07/2006 - Runner project put in to work the new Monitorization and Control Board.


20/06/2006 - Runner project added new freatures it's test field.

13/06/2006 - Runner project participated in the 50 IA exhibition.



20/01/2006 - New Unibrain firewire camera modified.




10/12/2005 - New test field in preparation.